Hydroelectric Turbine-Generator-On-Site Balancing
High vibration levels observed during the commissioning process of Unit-1 turbine-generator set at a domestic hydroelectric power plant necessitated a critical technical intervention to ensure the safe and sustainable operation of the equipment.